Section 1

Introduction and Overview

Welcome to the Workday Rising Europe 2023 event, taking place at Barcelona International Convention Centre (CCIB) and the AC Marriott Barcelona Forum.

This safety induction is provided by BK Events and Freeman on behalf of Workday and details the key safety information relevant to working on site including site rules, emergency contact information, and required PPE; some of which is mandatory

It is the policy of Workday to promote the highest possible levels of health and safety, so as to lead to the avoidance or reduction of risks to the health and safety of all persons who may be affected by their business activities, and to ensure compliance with all current and relevant Spanish legislation.

The Event Management makes specific commitments to its staff and contractors with regards working safely, personal safety and being mindful of safety when managing all work activities that will take place in both venues.

The Event Management considers that these issues are the responsibility of the company’s management team and rank equally with that of finance, marketing, human resources and commercial issues.

Once you have read and understood the health & safety information herein, please follow the link at the end of the induction to confirm that you have read, understood, and will comply with the safety requirements. A live list of persons completing the site safety induction is held by the Event Safety Advisor.

You MUST sign this site safety induction before you are permitted to work onsite.

To be able to access site, you must have photo ID with you.

Contractor risk assessments and method statements (RAMS) must be submitted in advance of the work activity and be specific for the work taking place.

Key Contacts

During the construction phase, all contractors are responsible for the safety management of their workers. In addition, the site activity will also be monitored by the Event Safety Advisor and the Production Managers.

BK Events Technical Director

Bernie Kearns

Mobile +44 7836 797 023

Freeman Production Director

Peter Germond

Mobile +44 7824 504 857

Freeman Production Manager

Pete Why

Mobile +44 7780 095 249

Event Safety Advisor

Debbie Law

Mobile +44 7831 293 078

Event Safety Advisor

Dan Tranter

Mobile +44 7521 951 452

George P Johnson

Alan Bonvouloir

Mobile +44 7879 412 590

Celia Byatt

Mobile +44 7778 618139

Workday Rising 2023


The event is being staged at:

CCIB
Plaça de Willy Brandt 11-14.
08019 Barcelona

&

AC Marriott Hotel Barcelona Forum
Paseo Taulat 278
08019 Barcelona



Ground Level Event Floor Plan below for reference. Contact your Production Manager for the most up to date plan.

Please click the image to access the pdf.

Please click the image to access the pdf.

Crew and contractors should access the venue via the correct route.

All contractors should access the venue via Door D.
You must ensure you have your induction completion email ready to show on arrival.

You will not be permitted into the build area without completing this induction

Please ensure you only access areas of the venue that are contracted to the event.

Event Dates

Saturday 11th - Sunday 12th November
Crew Reg at Entrance D from 0600hrs

Monday 13th November
Crew Reg at Entrance A open from 0600hrs

Tuesday 14th November
Crew Reg at Entrance A, 0600 - 1400hrs
NO CONTRACTOR ACCESS without event pass

Wednesday 15th - Thursday 16th November
LIVE EVENT
NO CONTRACTOR ACCESS without event pass

Thursday 16th November
Crew reg at Entrance A from 1600
Derig 1800 - 0000hrs

Friday 17th November
Derig 0800 - 2000 hrs

Section 2



Vehicles, MEWPS, Plant and FLTs




If you intend to operate plant, forklift trucks or vehicles you must ensure you are adhering to the safe working practices below:

  • If you are operating plant, you must hold the relevant licence and have shared this with the event management prior to arriving on site. You MUST also have a copy of the licence with you.
  •  All MEWPS entering the immediate working area MUST have a banksman supervising all movements.
  • If you are working in a MEWP, you MUST wear a hard hat at all times.
  •  The onsite speed limit is 10 km/hr.
  •  Any workers using MEWPS, or work that requires the use of a harness, must provide task specific RAMS, together with a detailed Rescue Plan.
  • All workers accessing the venue must keep to the designated pedestrian and vehicular routes around the site.
  •  Plant MUST be manoeuvred/ escorted by a banksman.


Section 3


Personal Safety

All workers and contractors MUST obtain, read and comply with the control measures detailed in their own company risk assessments and method statements.

  • All workers and contractors as a minimum MUST wear high visibility vests / clothing during the construction and de-rig phase of the event. You should have your high- visibility vest available for use immediately and not packed onto the back of your truck. Vehicle and traffic movements will be occurring during these times.
  • Black vests are not permitted.
  • During the construction and de-rig phases, Safety Footwear must be worn at all times.
  • Hard hats must be worn whenever overhead work is being conducted, when working in a MEWP, as directed by the event safety advisor, or your company risk assessment.
  • There may be times when the whole hall is designated a hard hat area so please ensure that you always have a hard hat available.
  • All other PPE must be worn that has been identified in your own company risk assessment.
  • It is important that you only conduct the work activity that you have been contracted to perform on site.
  • Access-ways, means of escape, stairways and fire exits shall be kept free from obstruction at all times.  
  • All venue prohibition signs and other warning signs shall be complied with at all times.
  • The site shall be kept clean at all times, with levels of noise controlled throughout.
  • It is the responsibility of the contractor to ensure that all workers are fully aware  of their role in the job as outlined in their company RAMS.
  • No radios or music playing devices allowed on site.
  • No shouting or swearing in any language allowed whilst on site.
  • The use of alcohol or drugs is strictly prohibited on site.

Using Mobile Phones 

Use of mobile phones is prohibited when: 

  • Working at Height 
  • Driving 
  • Operating Plant 
  • Using work equipment or machinery 

Do not walk around the site whilst using a mobile phone. If you need to receive or make a phone call sit down! 

Section 4


Working at Height

Work MUST be planned to avoid work at height where possible, use work equipment or other measures to prevent falls where you cannot avoid working at height and ensure that measures are in place to prevent falling objects.

Ladders

  • Ladders must be suitable for the activity being undertaken and should only be used for short duration tasks.
  • Ladders must be placed on a firm stable surface and must be footed. Ladders should extend to the correct height for the work being undertaken.
  • You must NOT work on the top two rungs of any ladder.
  • NEVER use flight cases as access equipment.

Access Towers

  • If using an access towers these must be built correctly by competent individuals with correct level of training (i.e., PASMA) and must include handrails, toe boards and outriggers. Handrails must be the correct height.

Harnesses (fall arrest / restraint)

  • The Event Safety Advisor MUST be informed if you wish to use any form of harness prior to your work commencing.
  • Harnesses MUST be worn and secured (clipped on) when working on live edges.
  • Any live or leading edges must have adequate protection from falls.


 

All work at height must be planned and included within your Company RAMS.

Section 5


General Safety & Welfare

  • Gangways, means of escape and fire exits MUST be kept free from obstruction at all times.
  • Good housekeeping is to be practiced at ALL times, ensuring all work areas are kept clean and tidy. Your work area must be tidied up at the end of day with all tools and equipment stored away safe and securely.
  • Please ensure all waste / rubbish is disposed of promptly.
  • Watch where you are going and look out for and avoid anything that may cause you to slip, trip, fall – don’t walk with your hands in your pockets or where your vision is obstructed and NEVER walk backwards.
  • Bring to the attention of the event safety advisor, any issues involving Health & Safety; report all accidents, incidents and near misses.
  • DO NOT come to work if under the influence of alcohol or drugs, no drinking alcohol is permitted or use of any drug unless under medical advice and with the knowledge of the event management, during the working day.
  • Smoking, vaping and e-cigarettes are not permitted anywhere inside the venue. These are permitted outside the venue only at the designate smoking points.
  • Open toe shoes are strictly FORBIDDEN during the build and de-rig.
  • There are suitable and sufficient toilets on site, PLEASE keep them clean.
  • You must maintain good personal hygiene whilst on site.
  • Drinking water will be available at the venue – keep hydrated at all times.

Section 6


First Aid



All Technical and Production Managers and Event Safety Advisors appointed on behalf of Workday will be in contact with the CCIB and AC Marriott Management in case of any emergency situation or medical emergency.

First Aiders will be on site for the duration of the Workday tenancy.  The CCIB emergency telephone number is:

+34 9323 010 83

Section 7

Emergency Procedures

image

In the event of an emergency, it may be necessary to evacuate the entire venue or individual areas of the venue. The process of emergency evacuation carries its own risks and will therefore only be undertaken when absolutely necessary.

You are about to enter the facilities of the CCIB. We hope you find them comfortable. In the unlikely event of an emergency during your stay, please proceed as follows:

  • Remain calm
  • Do not run
  • Do not use the lifts
  • Pay attention to the instructions given out on the PA system
  • Follow the exit signs that will take you out of the building
  • Follow the instructions given out by security staff
  • If you meet someone from the evacuation team (fluorescent yellow bib), follow their instructions
  • If you are visiting a member of CCIB Staff, please remain with that person and follow their instructions

Evacuation Procedure

  • Your assembly point for CCIB will be at  the Placa de Leonardo Da Vinci (please see plan below).
  • Follow all instructions that are given by venue and security staff.

In the event of an evacuation, leave the venue via the exits shown.

The assembly point is location on the Place de Leonardo Da Vinci

Section 8

Security

Please recognise that we are all experts in our workplace, and we are ideally placed to  spot when something is amiss.

 

In this period of heightened alert, it is vital to remain vigilant, trust our instincts and report any suspicious behaviour to the event safety advisor/production manager or the security team immediately.

 

The event site has a 24 hour security presence.

Now that you have read the induction

Please follow the link below to confirm you have read and understood the information provided to you in this site induction.

You will not be permitted to start work, unless you have completed the questions and signed this section

Click the button below to complete the induction