Morrisons Trade Briefing
Health and Safety Induction
Please scroll down

Section 1
Introduction and Overview



Welcome to the site safety induction for Morrisons Trade Briefing, 2024.
It is the policy of IGD to promote the highest possible levels of health and safety so as to lead to the avoidance or reduction of risks to the health and safety of all persons who, may be affected by their business activities and to ensure compliance with all current H&S legislation.
IGD management makes specific commitments to its staff and contractors with regards to working safely, personal safety, care of the environment and being mindful of safety when managing all work activities that will take place during the Morrisons Trade Briefing.
IGD’s management considers that these issues are the responsibility of the Company’s management team and rank equally with that of finance, marketing, human resources, and commercial issues.
Once you have read and understood the health & safety information herein, please follow the link at the end of the presentation to confirm that you have understood and will comply with the safety requirements. A live list of persons completing the Site Safety Induction is held by the IGD Event Management team.
This safety induction is provided by AFL Associates, on behalf of IGD and details the key safety information relevant to working on site, including site rules, emergency contact information and required PPE some of which is mandatory.
Site operational times during build and de-rig are between 08.00 and 20.00. If you require access outside of these times, you must contact the Production Manager with at least 24 hours’ notice.
Contractor risk assessments and method statements (RAMS) must be submitted in advance of the work activity and be specific for the work taking place.
You MUST complete and sign this Site Safety Induction before you are permitted to work on this event.
Key Contacts
During the construction phase, all contractors are responsible for the safety management of their workers. In addition, the site activity will also be monitored by the Event Safety Advisor and the Production Manager.
Engagement Operations Manager
Vicky Vandy
Mobile 07904 158 806
Production Manager
Henry Davey
Mobile 07769 972 242
Event Safety Advisor
Billy Howard
Mobile 07841 726 665


The event is being staged at:
Harrogate Convention Centre
Kings Road
Harrogate
North Yorkshire, HG1 5LA

Venue Location
Venue Location
Production Schedule.
Detailed below is the provisional schedule overview, please refer to the Production Schedule for more detail:
10th June
Build
Rehearsals
11th June
Live Event
De-Rig
Plans


Hall Q
Hall Q

Hall D
Hall D



Queens Suite
Queens Suite

Section 2
Vehicles, MEWPS, Plant and FLTs


If you intend to operate plant, forklift trucks or vehicles you must ensure you are adhering to the safe working practices below:
- If you are operating a plant, you must hold the relevant licence and have shared this with the Ivory Worldwide management prior to arriving on site. You MUST also have a copy of the licence with you.
- All MEWPS entering the immediate working area MUST have a banksman supervising all movements.
- Workers, contractors and deliveries should go to Harrogate Convention centre to contact the Production Manager regarding their area on arrival.
- The onsite speed limit is 5mph
- Any workers using MEWPS, or work that requires the use of a harness, must provide task specific RAMS, together with a detailed Rescue Plan.
- The correct harness MUST be worn for the MEWP operated and be inspected in compliance with LOLER 98.
- All workers accessing the sites must keep to the designated pedestrian and vehicular routes around the site.
- Plant MUST be maneuvered/ escorted by a banksman.
Section 3
Personal Safety


All workers and contractors MUST obtain, read and comply with the control measures detailed in their own company risk assessments and method statements.
- All workers and contractors as a minimum MUST wear high visibility vests / clothing during the construction and de-rig phase of the event. You should have your high- visibility vest available for use immediately and not packed onto the back of your truck. Vehicle and traffic movements will be occurring during these times.
- Black vests are not permitted.
- Whilst operating on site safety footwear must be worn at all times.
- Hard hats must be worn whenever overhead work is being conducted, or as directed by the Event Safety Advisor or your own Company Risk Assessment.
- Specific task-related Personal Protective Equipment (PPE) should be worn as outlined in your Risk Assessment and Method Statement (RAMS).

- It is important that you only conduct the work activity that you have been contracted to perform on site.
- Smoking will not be permitted in any place on site, except designated areas.
- Access-ways, means of escape, stairways and fire exits shall be kept free from obstruction at all times.
- The access and egress routes shall be kept clean and free from spills, waste, and other matter at all times.
- All site prohibition signs and other warning signs shall be complied with at all times.
- The site shall be kept clean at all times, with levels of noise controlled within the limits specified by the HSE.
- It is the responsibility of the Contractor to ensure that all workers are fully aware of their role in the job as outlined in their Company RAMS.
- No radios or music playing devices allowed on site.
- No shouting or swearing in any language allowed whilst on site.
- The use of alcohol and drugs is strictly prohibited on site.

Using Mobile Phones
Use of mobile phones is prohibited when:
- Working at Height
- Driving
- Operating Plant
- Using work equipment or machinery
Do not walk around the site whilst using a mobile phone. If you need to receive or make a phone call sit down!
Section 4
Working at Height

Work MUST be planned to avoid work at height where possible, use work equipment or other measures to prevent falls where you cannot avoid working at height and ensure that measures are in place to prevent falling objects.
All work at height must be planned and included within your Company RAMS.
Ladders
- Ladders must be suitable for the activity being undertaken and should only be used for short duration tasks.
- Ladders must be placed on a firm stable surface and must be footed. Ladders should extend to the correct height for the work being undertaken.
- You must NOT work on the top two rungs of any ladder.
- NEVER use flight cases as access equipment.
Access Towers
- If using an access towers these must be built correctly by competent individuals with correct level of training (i.e. PASMA) and must include handrails, toe boards and outriggers. Handrails must be the correct height.
Harnesses (fall arrest / restraint)
- The Event Safety Advisor MUST be informed if you wish to use any form of harness prior to your work commencing.
- Harnesses MUST be worn and secured (clipped on) when working on live edges.
- Any live or leading edges must have adequate protection from falls.



Section 5
General Safety

- Gangways, means of escape and fire exits MUST be kept free from obstruction at all times.
- Good housekeeping is to be practiced at ALL times, ensuring all work areas are kept clean and tidy. Your work area must be tidied up at the end of day with all tools and equipment stored away safe and securely.
- Please ensure all waste / rubbish is disposed of promptly.
- Watch where you are going and look out for and avoid anything that may cause you to slip, trip, fall – don’t walk with your hands in your pockets or where your vision is obstructed and NEVER walk backwards.
- Bring to the attention of the Event Safety Advisor any issues involving Health & Safety; report all accidents, incidents and near misses.
- DO NOT come to work if under the influence of alcohol or drugs, drinking alcohol is not permitted or the use of any drug unless under medical advice and with the knowledge of event management, during the working day.
- Smoking, vaping and e-cigarettes are not permitted anywhere except designated places.
- Open toe shoes are strictly FORBIDDEN during the build and de-rig.
Section 6
Welfare

- There are suitable and sufficient toilets on site, the Production Manager will direct you to them PLEASE keep them clean.
- Good housekeeping is to be practiced at all times, ensuring all work areas are kept clean and tidy as far as is reasonably practicable and must be tidied up at the end of day with all tools and equipment stored away safe and securely.
- Hand sanitisers are available throughout the site. You MUST maintain good personal hygiene whilst on site.
- IGD have provided unlimited drinking water on site.
Section 7
First Aid


First Response are providing first aid support and will be located in the first aid room in Hall Q for the duration of the build, event and de-rig. First Repsonse will be contactable via radio.
If you require medical assistance, please contact the Production Manager.
Nearest Hospital is:
Harrogate District Hospital
Lancaster Park Road
Harrogate
North Yorkshire, HG2 7SX
Tel: 01423 885 959
Section 8
Emergency Procedures

Harrogate Convention Centres Emergency Procedures
The Harrogate Convention Centres Emergency Procedures are detailed Below:
Bomb Threat Procedures
- If you find an unattended package/ bag etc. do not touch it. Inform Harrogate Convention Centre Management and Event Organisers.
- Do not activate fire alarms.
- If the threat is made by telephone the same procedure is to be followed.
Fire Evacuation Procedure
- If you discover a fire or suspect there is a fire, for whatever reason (i.e. you see smoke):
RAISE THE ALARM - operate the nearest glass fronted fire alarm call point (located near fire exits, main doors, linkways etc) - this will call the Fire Brigade and sound the alarms.
- The sounding of loud alarms/sirens indicates a fire alarm. In The Royal Hall there is a taped voice evacuation statement that asks you leave the building.
- Attack the fire with the equipment provided - only if there is no immediate danger to yourself. Be aware of the type of fire you are fighting, i.e. electrical fires must only be fought with green/black/blue extinguishers, or those displaying the appropriate markings. If possible, inform a member of Harrogate Convention Centre Staff/Duty Manager of the area the fire is in.
Evacuation
- If you should hear the alarm, evacuate immediately by the nearest exit and make you way to the appropriate assembly point.
Exhibition Halls A, B, C, M, E & F Crescent Gardens opposite the front of the Royal Hall, adjacent to the St George Hotel.
Royal Hall Crescent Gardens opposite the front of the Royal Hall, adjacent to the St George Hotel.
Exhibition Halls D, H, G, Q, Kings Suite, Queens Suite & Conference Centre The green on the opposite side of the road to the Conference Centre main doors.
- If you are a stand holder, do not try to remove your goods from the halls. Leave the halls immediately by the nearest emergency exit. Do not use lifts if fire alarm sounds.
- You will be informed of the situation at your assembly point. Permission to re-enter the halls may only be given by the Fire Officer in charge.

Assembly Points
Assembly Points
Section 9
Security

Please recognise that we are all experts in our workplace, and we are ideally placed to spot when something is amiss.
In this period of heightened alert, it is vital to remain vigilant, trust our instincts and report any suspicious behavior to the Production Manager or the Event Management Team immediately.
The venue has a 24 hr security presence.




Complete the induction
Now you have read the content, please click the button below to complete your induction questions and submission.